Work Underway at Assumption Cemetery

Please note, this post is 1951 days old.

The information listed in this post may be out of date. It has been preserved here for historical purposes.

Categories: Assumption News

This Spring, Heavenly Rest has been undertaking several construction projects at Assumption Cemetery.

The work includes:

  • The addition of a drainage tapping into the city’s system on Huron Church Road. This will assist with the flooding that occurs annually into the low section on the northeast side
  • The roadway is being paved with asphalt ( including a 6 inch base)
  • The main entrance on Wyandotte Street is being widened and a curved arch is being added
  • The crucifix and two statues have been removed from their crumbling bases and will be reinstalled onto new foundations with field stone features
  • The crucifix and statues will be bronzed
  • Canadian and USA flags will be installed on 40ft poles behind the crucifix
  • Some perennial landscaping will be added
  • The Lavin Mausoleum has been repaired, refurbished and cleaned and the McKee Mausoleum has been structurally assessed and cleane